Tri-State Roof Pros
← All services

New Roof Replacement

When a roof is past repair, we match you with vetted local crews for a full tear-off and new roof system.

Roofer lifting shingles to show rotted wood and rusted flashing
What we found: rotted wood and bad flashing
Asphalt shingle roof with missing and curling shingles
Before: shingles blown off and curling
  • Full tear-off and new underlayment
  • Architectural shingle and metal options
  • Financing options on approved credit
  • Manufacturer and labor warranties
See Good, Better, Best Roof Systems

A replacement takes the old roof off down to the wood, fixes what is under there, and builds the whole system back: underlayment, flashing, vents and shingles.

Signs you may need this

  • The roof is near the end of its expected life
  • Shingles are curling, cracked or losing their surface grit everywhere
  • You have had repairs in several different spots
  • There are two or more layers of shingles on already
  • The roof sags or feels soft underfoot

How the visit goes

  1. 1. Measure and plan

    The roof is measured, the layers are counted, and the list covers everything: deck repairs, flashing, vents, valleys and material.

  2. 2. Tear-off on a dry day

    The old roof comes off. Tear-off is never started when rain is likely, because an open roof and rain do not mix.

  3. 3. Fix what is underneath

    Soft or rotted wood is replaced. This is the part nobody can price exactly in advance, so the estimate says how it is handled.

  4. 4. Build the system back

    Underlayment, ice and water protection where it belongs, new flashing, valleys, vents, then shingles. Old flashing does not get reused to save a dollar.

  5. 5. Clean up and walk it with you

    Magnet sweep for nails, debris hauled, then photos of the finished work and how the vents and valleys were done.

What changes the price

We do not post prices, because a roof nobody has looked at cannot be priced. These are the things that make the job bigger or smaller.

  • • The size of the roof and how steep it is
  • • How many old layers have to come off
  • • How much wood decking has to be replaced
  • • Chimneys, skylights, dormers and valleys, which all add labor
  • • The material you pick and the vents and flashing that go with it

Questions homeowners ask

How long does it take?
Many houses are one or two days. Bigger, steeper or more cut-up roofs take longer. The roofer tells you the plan before starting.
Do I have to move out?
No. It is loud, and things hanging on walls can shake, so take down anything fragile and plan around the noise.
What happens if it rains?
Work stops and the open area is covered. No tear-off gets started when rain is likely, on purpose.
What about my driveway, plants and pets?
Cars come out of the driveway, plants near the house get covered, and pets should be inside or away for the day. That list is in the prep notes you get before the job.

Straight talk: Nobody can tell you exactly how much rotten wood is under a roof until the shingles come off. A good estimate says how that is priced instead of pretending it will not happen.

Other services

Get a Free Replacement Quote

Four quick answers. Free inspection, no cost and no obligation.

Add roof details (optional)
What kind of roof do you have?

Every roofer we connect you with must be licensed and insured.

By submitting, you agree to be contacted by phone or text about your roof. You can opt out at any time.

What to expect

Straight answers to the questions people ask before they book.

How soon can you come out?
For most inspections and estimates, within a few days. If water is coming into your house right now, call us — active leaks jump the line.
How long will the appointment take?
Plan on 45 minutes to an hour. We walk the roof, check the attic when we can, take photos, and sit down with you to go over what we found and the written price.
Do I need to be home?
Yes, plan to be there. Sometimes we need to get into the house or the attic to find the real source of a leak. Being home also means you hear the findings straight from us instead of a phone call later.
What if it rains on my job day?
We don't tear off a roof when there's a real chance of rain. We follow a rain-percentage rule: if the forecast shows a meaningful chance of rain during the day, we push the tear-off to the next good day. Nobody races a storm with a tarp on your house.

Before we come out

Please be home, and clear a path to the attic door if you have one.

This is the list for a full roof install day. You do not need any of it for an inspection.

  • Let your neighbors know the day before — ladders and a dumpster are easier when they expect it.
  • Move cars out of the driveway and off the street in front of the house.
  • Keep pets inside, and please clean up the yard first.
  • Trim bushes and shrubs back from the sides of the house so the crew isn't standing in them.
  • Take down yard decorations, statues, solar lights and anything fragile near the walls.
  • Clear a path to the attic or crawlspace — we may need to check underneath the roof.

Questions before we get there? CALL NOW (215) 326-2712

CALL NOW (215) 326-2712GET A FREE ESTIMATE